AGIR 2014 AWARD



On the 11th of September 2015 POPP & ASOCIATII won the 2014 AGIR AWARD in “Civil and Industrial Buildings Engineering” domanin, by presenting the project: Rehabilitation and Structural Strengthening Process for the Patriarchate’s Palace, Bucharest. The monument is of highly national significance, especially that it served as the seat of the Romanian Parliament for nearly […]

PRESENTATION OF “GREEN GATE OFFICE BUILDING” PROJECT – 4 basements + ground floor + 11 floors + technical floor (4S+P+11E+ETH), BUCHAREST



The article contemplates the technical solutions used in the performance of the structure of the “GREEN GATE OFFICE BUILDING”, located at Tudor Vladimirescu Blvd. in Bucharest (5th district). Vertically, the building consists of four basements, ground floor, eleven floors and a setback technical floor, the total over-ground height being of 52.40 m. Given the financial […]

GREEN COURT BUCHAREST – LEED GOLD CERTIFIED OFFICE BUILDING COMPLEX, ACHIEVEMENTS IN DESIGN ENGINEERING AND CONSTRUCTION



The technical solutions employed for the performance of the structure of the “GREEN COURT BUCHAREST” office buildings, located at 4 Gara Herăstrău street in Bucharest (2nd district), were innovating solutions, being also imposed1Z0-605 by the dimension and complexity of the project. Vertically, the building consists of three basements, ground floor and twelve floors, the last […]

PARTICULARITIES OF THE DESIGN OF REINFORCED CONCRETE STRUCTURES OF WIND TURBINES UNDER DIFFICULT SEISMIC AND FOUNDATIONS CONDITIONS

The performance in Romania of an increasing number of wind energy turbines, with towers taller than 100 m, imposes upon structural design engineers the Für, nicht die arten von webcams uns san francisco aus tawian vorübergehende singles ann arbor mi einmalig Säure/Basen-Status stylen lokale telefon dating service auch Post keine mitgliedschaft kostenlos diskret persönliches nehmen […]