PRESENTATION OF “GREEN GATE OFFICE BUILDING” PROJECT – 4 basements + ground floor + 11 floors + technical floor (4S+P+11E+ETH), BUCHAREST



The article contemplates the technical solutions used in the performance of the structure of the “GREEN GATE OFFICE BUILDING”, located at Tudor Vladimirescu Blvd. in Bucharest (5th district). Vertically, the building consists of four basements, ground floor, eleven floors and a setback technical floor, the total over-ground height being of 52.40 m. Given the financial […]

GREEN COURT BUCHAREST – LEED GOLD CERTIFIED OFFICE BUILDING COMPLEX, ACHIEVEMENTS IN DESIGN ENGINEERING AND CONSTRUCTION



The technical solutions employed for the performance of the structure of the “GREEN COURT BUCHAREST” office buildings, located at 4 Gara Herăstrău street in Bucharest (2nd district), were innovating solutions, being also imposed1Z0-605 by the dimension and complexity of the project. Vertically, the building consists of three basements, ground floor and twelve floors, the last […]

IMPACTUL REALIZARII CONSTRUCTIILOR IN EXCAVATII ADANCI ASUPRA CLADIRILOR EXISTENTE IN VECINATATE

REZUMAT: Pornind de la situatiile concrete intalnite in zona orasului Bucuresti, se prezinta metodele utilizate de autori pentru evaluarea influentei amplasarii noilor constructii in zone urbane, dens construite. Rezultatele calculelor sunt comparate cu masuratori realizate la sprijinirile excavatiilor adanci si in cadrul urmaririi tasarii constructiilor noi si singles 2 unzensierte version des spiels gosiasamosia.plfree sex […]